Legal Services: Upchurch, Bailey and Upchurch has served as school board attorney since 1997. The current school board attorney Frank Upchurch announced his retirement which triggered the search for a new board attorney. The district issued an RFI in September of 2026 and received submissions from 6 qualified legal firms. Board members and staff viewed the firms qualifications at the October 6 and 27th workshops including retainers, inclusion and exclusions.
The board voluntarily uses an open competitive information process despite legal services being exempt from competitive solicitation. The board narrowed the candidates to Rumberger, Kirk and Caldwell PA and Sniffen and Howard PA for interviews and further evaluation.
The board moves to select Sniffen and Howard PA for legal services due to familiarity with current district legal matters. Board members including remote participant Dr, Thompson, expressed strong agreement that Sniffen and Howard PA is the best fit. The board authorizes the superintendent to negotiate and execute agreement with Sniffen and Howard PA. The board requests the contract clarity on attorney presence, travel time, and on-site availability expectations since they are housed in Tallahassee, Florida. The board unanimously in favor, with no public comment, and the motion to approve legal services carries.
High School JJJ Plans: The board received phase one approval request for high school JJJ site and floor plans. The district aims to complete design, bidding and contractor selection this school year for 2029-2030 opening.
High School JJJ will be built on a 96.5-acre rectangular site in the Silverleaf Community along County Road 16A. The high school site relocated within Silverleaf in 2019 with county commission approval after developer request. The board notes Tocoi Creek High School’s location relative to the new JJJ site for regional planning and awareness.
The new high school follows a modernized Ponte Vedra High School prototype upgraded to serve about 2100 students. The campus will connect County Road 16A and Silverleaf Drive, pending wetland surveys and county approvals. Engineers will finalize the 16A access location after completing wetland surveys and coordinating crossing and access spacing with the county. Internal roads will include speed bumps to slow vehicle and discourage speeding. Large setbacks, retention ponds and existing wetlands will provide natural buffering between school facilities and adjacent homes.
Most Silverleaf students will access the school via an internal connection road to avoid driving out and back in. There are separate entries for parent drop-off, student parking, teacher parking and buses, each with designated access points. A long internal parent loop will stack cars on-site, reducing congestion on surrounding roads during drop-off and pick-up.
Practice fields, tennis and basketball courts, and potential future relocatables are sited away from property edges. Stadium lighting will be designed so light does not spill beyond school property, per regulations and neighbor concerns. Nearby residents may hear games and band practices, but the district frames this as typical community high school activity.
Major mechanical equipment like the chiller is buried toward the site center to minimize noise for neighbors. This district is evaluating fencing and natural barriers to keep students out of the retention ponds without fencing property lines. Fencing will be placed inside the site using buildings and roads as barriers, not directly on property boundaries. The team plans to use natural vegetation and buffering to deter unauthorized access from adjacent properties.
An adjacent district owned parcel across 16An has no planned use now except for a future roadway connection.
The new high school will include core classrooms, Arts, CTE academies, Athletics, Cafeteria, and ESE spaces. The high school design reserves space for a future ROTC program, though none is currently planned.
The high school building wraps around a courtyard configured for emergency vehicle access. District high schools still require roughly one full high school’s worth of seats despite recent openings. The Silverleaf development will eventually generate enrollment equal to an entire high school. The new high school aims to relieve overcrowding at Tocoi Creek High School by the 2029-2030 school year. The board approved the high school JJJ plans with no public opposition.
Hastings Workforce Facility: A $9.4-$9.5M EDA grant plus $1.8M match will fund a 20,000 square foot workforce center in Hastings. The new facility will house solar and alternative energy and diesel systems technician training programs. The existing Diesel systems technician program will move from the main FCTC campus to Hastings.
The workforce building’s design and roofing will visually complement the historic Hastings High School architecture. Rooftop solar and outdoor work areas will support hands-on solar and alternative energy instruction. Five bays, a modified pit, and reinforced concrete allow work on semi trucks, buses and heavy equipment. The workforce facility connects Hastings High School and is integrated with existing parking and “Lake Hastings” retention pond.
Strict grant requirements drive an accelerated schedule to complete the workforce facility by 2028. The facility will support regional workforce development, including technicians for agriculture-related diesel equipment. The board unanimously approved FCTC workforce training facility plans following brief discussion and no public comment.
Dr Asplen, Superintendent recognized the stepping down on school board member Bev Slough and Kelly Barrera.